Pre-Pour Pressure Testing: Catch Failures Before They're Buried
Newly installed water pipe systems should be pressure tested before concrete is poured. A failed joint, cracked fitting, or undersized line found early can be repaired and retested quickly. Found after the building is occupied, the same issue can lead to excavation, reconstruction, water damage investigation, defect claims, and major cost. ALD conducts pre-pour pressure testing on your construction schedule, using certified equipment and documented procedures. We provide written certification that meets Australian Standards, builder requirements, regulatory needs, and insurer expectations, giving builders and developers a clear record before the next construction phase.